NEW EXHIBITION AND OFFICE SPACE BUILDING IN THE AREA OF GLYKA NERA ATTIKIS (2023)
Project Details:
Owner : NOVART ΑΕΒΕ
Employer / Commissioning Body: A.R.I.S. Architects S.A. Consulting Engineers
Architectural Design : A.R.I.S. Architects S.A. Consulting Engineers
Structural Engineers : CK Structural Engineers & associates
Design Stages : Preliminary, Scheme design & Detailed design
Project Period : 2023 – now
Project Stage : In progress
Project Description:
Structural study of a new building with steel load bearing system in its superstructure and a basement made of mixed load bearing system from both reinforced concrete and structural steel. The building in its superstructure has a ground floor, an interior balcony, a first floor and a roof with a plan area of approximately 250 sq.m. The plan area of the basement is around 478 sq.m. The load bearing system of the superstructure is formed by steel main frames in the horizontal direction and frames with vertical braces in the vertical direction. Its foundation system consists of general raft slab foundation. Analysis was performed with Fespa 22 v.8.3.0.16 software.